Chinese Granite Factory Direct Supply: What a Factory Quote Should Include
A direct granite factory quotation is comparable when it states the material, finished quantities, fabrication, inspection, packing and handover included in the unit price. Ask the quoting company to identify the site that will perform the work and the party that will take responsibility for the finished order. Send the same drawings and quantity schedule to each bidder, and have each bidder return a marked copy that flags allowances and exclusions. This is especially useful when standard tiles, edge pieces and drawing-based components are quoted together. One missing process can change the budget even when the price per square metre appears attractive.
Identify the supplier and scope of work
Ask who will issue the quotation, enter the contract, make the goods and receive payment. Obtain the legal company name and the actual fabrication address. If some work will be carried out by a partner, request the names of the processes involved and a clear statement of who will inspect that work and remedy defects. If a purchase order covers the supply of finished stone, the quote should identify the party accountable for the finished pieces and the documents required for handover.
Use the drawings to ask which operations the factory is pricing. A supplier might confirm sawing and surface finishing immediately, but request a section or a template before pricing a curved groove, a shaped end or a handed piece. Encourage these questions early. When a document lacks dimensions, get the bidder to state the working assumption and mark the affected lines as provisional. A budget figure that contains an allowance is useful as long as the buyer can tell when and why it will change.
Define the material on the quotation
Ask for the proposed granite name or trade designation, reference sample, intended finish and any source or batch information specified in the enquiry. If the purchase is based on an approved sample, give its reference number and indicate which surfaces and viewing conditions the approval covers. Distinguish a named grade in the drawings from any alternative suggested by the factory. Ask for alternatives on separate lines so that the specified material can still be compared on common terms.
An allowance for selection may apply where several visible pieces must be matched. Show those pieces together in a marked plan and indicate whether they will be installed in a single run or in separate areas. Ask how the proposed price treats sorting, additional samples, and any material reserved for replacements. For tests or reports required by the project, list the documents in the enquiry and have the supplier state what is available, what needs to be ordered and whether the cost is included. Project personnel should confirm the applicable acceptance requirements.
Compare quantity and fabrication on the same basis
Provide finished length, width and thickness for each item and state the measurements in the same units throughout. Number each row and print that number on the corresponding detail. For repetitive panels, list the quantity and the billable unit. For a special corner or transition piece, add a section and plan view, and indicate orientation where left and right pieces differ. If a metre rate assumes one common section and length, identify the items to which that assumption applies.
One example illustrates why the basis matters. For a hypothetical order of 100 rectangular pavers measuring 600 by 300 by 30 millimetres each, the total nominal finished face area is 18 square metres and the total nominal finished volume is 0.54 cubic metres. These calculations exclude joints, rejects, extra material, breakage allowances and offcuts. The amounts are illustrations of the units, with no price assumed. If a factory bills from raw material used, ask it to explain the quantity and the cutting allowance in writing before comparing it with a price based on finished area.
Many operations depend on which side of the stone is shown after installation. Indicate the top face, visible returns, edges to be eased and faces that may remain sawn. If the end of a step is visible on one side only, show the exposed end on the detail. Ask which processes are covered by the unit price and which incur setup or fixed charges. A separate price for template preparation, special tooling, first pieces or individual marking helps the buyer see what will change if the order is split, the quantities vary or revised drawings are issued.
Set the treatment of optional or uncertain quantities explicitly. For example, a schedule might include a spare allowance and an optional group of corner pieces pending a setting-out decision. Give both groups provisional quantities and ask for separate subtotals. Confirm whether the quoted unit rate would still apply if the buyer ordered fewer pieces or split the same line into two releases. Where a minimum quantity or setup fee applies, the quotation should identify the relevant item or group. That way a buyer can compare the base order without losing the information needed to price a likely change.
Ask how inspection and documentation are priced
List the inspection steps you need and have the factory show where they sit in the quotation. A source-approved sample, a measured first piece and a check before packing serve different purposes. If a third party will inspect, ask who will provide samples and instruments, which locations will be available and how notice will be given. Separate the factory's routine checks from requested witness tests, additional sorting or an independent visit so the time and responsibility are clear.
Ask for a first-piece record on a typical awkward item. For instance, a transition kerbstone might have a sloping top with a change in height and a chamfer over only part of its length. The record can show the drawing revision, which end is higher, the locations where measurements were taken and any outstanding approvals. Include the cost and time needed for that approval in your comparison. If the initial review raises a new requirement, ask for the change to be acknowledged in the quote and the production schedule.
Require a named and priced handover
The quotation should state the exact location at which the goods are handed over, the planned packing method and the responsibilities included up to that point. A factory collection quote and a delivery quote can both be suitable if the costs and work between the two points are shown separately. Ask which party will arrange loading, freight, insurance where called for, export or import tasks where applicable, and unloading. Where an international rule is proposed, ask the seller to name the rule, version and place and confirm the responsibilities in the agreed documents.
Describe how the goods will travel and be received. The factory can then say what crate construction, separation, labelling and handling allowances are priced. Ask for expected crate dimensions and weights when those affect the carrier's selection or the receiving site's equipment. If the order will be released by zone, have the quote show any charge related to split packing or several collection dates. If a fixed charge covers one load only, ask how further loads will be calculated and when the final amount becomes known.
For a landed comparison, gather third-party costs and add them to supplier prices only once. Set out origin charges, transport and destination tasks on separate lines so that gaps or overlapping charges are visible. Ask the responsible parties for current figures for the same load and route when available. If the cost is estimated, record the source, date and conditions of the estimate and keep it separate from the confirmed supplier price. The factory quotation and the landed comparison can then be reviewed together as two versions of the same scope.
A comparison grid can be brief. Give each offer columns for the base manufactured goods, extra machining, inspection, packing, handover point and transportation. Record exclusions next to the relevant line and keep the bidder's stated currency in view. If the project team converts offers, note the common exchange rate and date used for comparison. A subtotal that excludes a task still needs an owner and an estimate before the buyer can budget for it. Send the resulting list of open items back to the bidder and request amendments to the dated quotation so all parties work from the same version.
Compare written revisions before signing
Request quotation date, currency, period of validity, production assumptions, expected handover timing, payment milestones and the changes that would trigger a revised price. Where the buyer provides late drawings or changes packing after agreement, require a written revision identifying the affected item codes. Keep that revision with the purchase order and ask the supplier to acknowledge the approved version before cutting. If a quantity or delivery date remains open, write down who will confirm it and by when.
A practical comparison takes a representative line and follows it through the order. For example, find the quote for a terminal kerbstone, check its drawing, trace the stone and finish to the proposed sample, then find the packing and delivery included in that price. If the line only refers to a general price list, ask the bidder to spell out the included operations. Repeat the exercise for a standard item and a large or hard-to-handle component. Quotations that pass those checks make it easier to spot a genuine difference in scope.
Questions buyers can send with the request
What should I supply before requesting factory prices? Send dimensions, finish, quantity, intended use, exposed faces, drawings and sample references, plus the destination or collection point. Mark dimensions still to be confirmed. Ask the factory to state whether it is offering a firm price for the listed scope or an estimate pending drawings, stock or freight details.
How should I compare prices if one factory quotes only finished pieces and another includes installation-related services? Price both quotations against a common list of tasks. Separate manufacturing, delivery, on-site handling and installation, then place each cost with the party that will actually perform the task. Include all known charges and show estimates separately. Check whether packing and transport plans depend on the same assumptions about site access, unloading and the order of arrival.
Related products and sourcing support from Kaizhong Stone
Shandong Kaizhong Stone is based in Wulian County, Rizhao, Shandong. Buyers comparing factory quotations for cut-to-size granite paving, kerbstones, steps or drawing-based components can submit an item schedule showing both the standard and the special pieces. For materials including G603 white and G614 grey granite, include your sample references and finish requirements. For pieces with angled ends or exposed returns, attach the drawing revision and indicate the finished dimensions and visible faces. Ask which fabrication, checks, packaging and handover arrangements can be priced for your order. If a quote must distinguish packing or collection by lot, give the proposed shipment quantities and dates. Buyers can also ask about a factory visit or a video review of relevant processing steps. The project procurement and surface finishes guides linked here can help turn an initial enquiry into an itemised request. Use the contact page to send the drawings, destination and date when the quotation is needed.